Estym8 DocsEstym8 Home

Plan-intelligence SKUs — adjacent use cases

Product context: Estym8 is built from scratch as an AI-first construction preconstruction platform. Canonical framing: AI-first positioning.

Status: Discovery map (2026-07-17).
Question answered: Beyond Estym8 (full-project estimating) and municipal plan check, what other jobs can the same plan-reading engine serve?

Related (public): ClearToPermit · ClearToIssue · Bodi · Estym8 vs Bodi · folder workflow · AI-first positioning.
Repo: estimate-to-submittal-generator.md · paul-notes.


Shared asset vs job head

Shared (keep building once)Swap per SKU
Folder / multi-PDF ingestBuyer + pricing
Classify process vs skipSuccess metric
Sheet / discipline intelligenceWorkflow (queue, portal, export)
Organic legend / schedule / plan readsAuthority (codes, specs, checklists — never invent)
Concerns / conflict patternsApp surface + brand

Pattern that works: same spine, new job + buyer + success metric.
Pattern that does not: “Estym8 for X that also estimates for X,” or full-cloning the Estym8 app per vertical.

Estym8 stays the full-project estimating product (multi-trade takeoffs from plan sets and bid folders), with two depths on one organic spine: ROM / WAG (fast chase-vs-pass) and full bid-grade takeoff + estimate — see paul-notes §25. Adjacent SKUs do not sell city BOMs or invent compliance.

UX — cohesive workflow + AI assist (suite-wide)

Every suite app (Estym8, Bodi, ClearToPermit, ClearToIssue, …) is a real job workflow with structured screens, queues, and work products. AI assists inside that experience. We do not design chatbot-first products (“ask AI about your plans” as the home). Optional scoped chat (Estee-class) is a helper on a case, never the product itself. See municipal-plan-check — UX principle.

Suite competitive position — no AI-first suite peer

Claim (honest): There is no AI-first competitor building the suite we are creating — one greenfield plan-reading spine powering Estym8 (GC takeoff/estimate) + Bodi (ICT BOD) + ClearToPermit (city review workflow) + ClearToIssue (A/E design QA) as cohesive workflow apps.

TrueFalse / do not say
No peer ships (or clearly roadmaps) this full AI-first portfolio on one organic folder-native spine“No AI competition in construction”
Point tools crowd each lane (Archistar/CivCheck/Blitz municipal; takeoff AI; Procore/Autodesk platforms bolting AI on)“Empty field for municipal plan review”
Strategics have breadth but are not AI-first-from-scratch suite products in our sense“We invented AI plan review”

How to say it: Point tools and legacy platforms compete in pieces. Nobody else is assembling an AI-first construction intelligence suite — takeoff, city permit review, design QA, ICT BOD — on one engine.


Prioritized use cases

PriorityUse caseBuyerJob (not estimating)Success metricFit
1Municipal plan checkCities / AHJsCompleteness + locale-code concerns for permittingTime to deficiency list; false-positive rateStrong — see municipal-plan-check.md
2A/E design reviewDesign / engineering firmsInternal QA: coordination + completeness before issue / sealIssues caught pre-issue; review cycle timeStrong — see ae-design-review.md; Paul requirements this week
3Applicant pre-checkGCs / A/E / developers“Will the city bounce this?” before submitFirst-pass readiness; fewer resubmittalsSame engine as #1; dual-sided GTM (Permittable already plays here)
4Estimate → submittalEstimators / PMs (Estym8 users)Spec compliance / submittal packages from the takeoffPackage completeness; draft review qualityDeepest in-repo path — keep inside Estym8, not a new brand (estimate-to-submittal-generator.md)
4bROM / WAG screeningGC / electrical estimators (high bid volume)Chase vs pass before full bid effort (~200 opps/mo)Time-to-ROM; band hit-rate / ranking quality (not F4c)Inside Estym8 — one spine, runDepth: rom | full; not a new brand (paul-notes §25)
5Owner / CM bid-package diligenceOwners, CMs, developer’s repsCompleteness, conflicts, scope gaps before awardIssues caught pre-award; cycle time to awardHigh — folder intelligence without BOM
6Insurance / surety underwriting assistCarriers, brokersRisk flags from plans (life safety, occupancy, systems)Underwriting time; evidence qualityMedium — concerns + citations; not pricing
7Lender / inspector field packLenders, special inspectorsWhat’s drawn vs what’s claimed; deficiency listsInspection prep time; citation-backed flagsMedium
8Facility / as-built ops handoffOwners, facility managersDevice/system inventory from record drawingsInventory coverage; ops UX adoptionLonger-term — takeoff-like counts, different buyer

Recommended sequencing

  1. Keep Estym8 takeoff accuracy advancing (Dogtopia / Castle / broader corpus) — spine credibility.
  2. Prove municipal (#1) with a design partner (e.g. Peoria) — completeness + citation comment log + back-check (Paul: highest city value).
  3. A/E design review / pre-check (#2 + #3) with Paul — same rule packs; firm QA + “run city-style checks before submit.”
  4. Feasibility (parcel/zoning) when public-data path is clear — early designer/developer wedge.
  5. Keep submittal (#4) in Estym8 — do not spin a second company for it.
  6. ROM / WAG (#4b) in Estym8 — same spine, thinner depth; build after full-path organic trust allows bandwidth (not a parallel pipeline).
  7. Owner / CM diligence (#5) if municipal GTM is slow.
  8. Revit/BIM model audit — time-boxed spike before promising GA.
  9. Insurance / lender / facility (#6–8) after concern + citation UX is proven.

Portfolio (investors — refreshed 2026-07-24; ROM note 2026-07-31)

ProductWorking brandBuyerJob
Estym8Estym8GC / estimatorsFull-project takeoff + estimate (+ submittal docs) — raise anchor; ROM/WAG = fast depth on same spine
BodiBodiICT / LV (+ project-brain framing)Project brain → BOD (sources/claims) — entity upside
Municipal plan checkClearToPermitCities / AHJsPermit review + back-check + audit trail (not city BOM)
A/E design review / pre-checkClearToIssueDesign / engineering firmsInternal QA + “city-style” pre-submit checks
Feasibility (discovery)ClearTo* / TBDArchitects / developersParcel/plat/zoning → buildable envelope
Model audit (future)Shared spineAll SKUsRevit/BIM relational extract + PDF↔model consistency

Same plan-reading spine; distinct brands/surfaces. Paul notes (2026-07-24): full suite map + shipped-vs-aspirational tags → paul-notes-construction-ai-suite-2026-07-24.md.


SKU sketches (short)

1. Municipal plan check

Ingest permit set → completeness vs jurisdiction checklist → drawing conflicts → locale-code concerns with citations → deficiency package.
Not city estimation. Detail: municipal-plan-check.md.

2. Applicant pre-check

Same engine and rule packs as #1; UX for the submitter: readiness score, fix list before queue.
Can share domain/brand with municipal (e.g. ClearToPermit / ReadyForPermit) with role-based surfaces.

3. Estimate-to-submittal (Estym8)

Already on the Estym8 roadmap — catalog, packages, compliance matrix, draft spec AI.
Do not rebrand as a separate municipal product.

3b. ROM / WAG screening (Estym8 depth mode)

Job: Rough Order of Magnitude / WAG price (and coarse organic drivers) so estimators can decide which bid opportunities deserve a full detailed estimate.
Architecture: One organic folder spine; runDepth: rom | full. Shared ingest/classify/legend/schedule/scope; ROM early-exits with thin counting + indicative $; full path = current consensus takeoff + estimate. Promote-to-full reuses artifacts.
Not a new brand or a second processing codebase. Detail: paul-notes §25.
Engine: MVP shipped (runDepth + ROM early-exit + labeled romJson). Open: promote-to-full, indicative $ band, ROM eval.

4. Owner / CM diligence

Ingest ITB / bid folder → missing disciplines, revision conflicts, scope ambiguity, coordination risks → diligence memo for award.
No BOM required; concerns + package completeness are the deliverable.

5. Insurance / surety assist

Ingest drawings → structured risk flags (egress, fire, occupancy, major systems) with sheet evidence.
Human underwriter stays in the loop; product must not claim “approved for coverage.”

6. Lender / inspector pack

Lightweight deficiency + evidence export for draw / special inspection prep.
Often a thin export mode on #4 or #1 rather than a full new app.

7. Facility / as-built ops

Record-drawing inventory (devices, panels, equipment tags) for ops/handoff.
Closer to takeoff counts than permitting; lowest near-term priority vs #1–4.


What not to build

Anti-patternWhy
City cost estimating / BOMsWrong job; confuses Estym8 and municipal GTM
Automatic permit approvalLiability; cities will not trust a black box
Full Estym8 clone per verticalMaintenance tax; share libraries, not the app
Separate ROM pipeline / “second AI”Drifts from full path; invites Prime Directive shortcuts; kills promote-to-full reuse
Human BOM–derived complianceViolates Prime Directive culture; invents “truth”
Claiming empty-field AI plan review (single lane)CodeComply, Blitz, Permittable, Archistar, etc. already compete
Claiming no AI-first suite peerOK — see Suite competitive position above

Brand / engine relationship

ProductBrandEngine credit
Estym8Estym8.aiPrimary — estimating
BodiBodi (portfolio)ICT/BOD — complementary; see BODI_ESTYM8_INTEGRATION.md
Municipal + applicantClearToPermit (working)“Powered by the same plan-reading engine as Estym8” in partner materials
A/E design reviewClearToIssue (working; Paul confirm)Same spine; design-firm GTM — module fallback if one-login preferred
Owner / CM diligenceTBD — could share municipal brand or Estym8 add-onDecide after #1 pilot
SubmittalEstym8In-product

Open decisions

Track execution in ../UNIFIED_BACKLOG.md Suite discovery — not a second queue.

  • Confirm sequence: municipal ↔ A/E design review discovery in parallel → applicant → owner diligence
  • Whether applicant and city share one domain
  • A/E design review: separate brand vs Estym8 “Design Review” module (Paul)
  • Whether owner diligence is a third brand or Estym8 “Diligence” SKU
  • Insurance/lender: partner vs build after municipal proof
  • Investor pack refresh (2026-07-22) — overview / staged brief / pitch include ClearToPermit + ClearToIssue; Bodi still secondary
  • Paul extensive notes ingested (2026-07-24) — suite modules, back-check, parcel/feasibility, Revit, comment-log schema; see paul-notes…
  • Central backlog SoT (2026-07-24) — UNIFIED Now/Next/Later/Suite/Ops
  • Paul confirms ClearToIssue vs Estym8 module + v1 checklist priority (title-block/index first?)
  • Registrar buy for ClearToPermit / ClearToIssue domains
  • Revit/APS spike scheduled
  • ROM / WAG depth mode (2026-07-31) — one Estym8 spine, ROM | FULL; MVP engine + UI — paul-notes §25

Document history

DateNote
2026-07-17Initial map from municipal discovery conversation — prioritized SKUs sharing Estym8 plan-reading spine
2026-07-20A/E design review (#2) for Paul requirements; portfolio note (Estym8 + Bodi + municipal + A/E); investor refresh deferred checklist
2026-07-22Working brands ClearToPermit + ClearToIssue; investor materials refreshed
2026-07-24Paul notes synthesis; suite modules (back-check, feasibility, Revit); sequencing updated
2026-07-31ROM/WAG (#4b / §3b) — inside Estym8, one spine two depths; engine deferred