Instructions
Walk top-to-bottom before locking counts; skipped rows tend to explode during internal QA rather than improving in the field.
Discipline coverage
- Mechanical / electrical / plumbing (and ancillary trades when in-scope) sheets all included on this revision
- Latest issue dates match across coordinated drawings
- Title blocks show the same identifying strings referenced in exclusions
Schedules
- Door, fixture, equipment, plumbing fixture, and panel narratives exist when bids rely on quantities
- Schedule-driven quantities reconcile to plan call-outs within tolerance you approve
- Demo / phased sets captured before scope freezes
Legends
- Active trade legends include every counted glyph on dominant plans
- No orphan descriptions on heavy-density floors
- Demo vs new symbology explained where mixed
Cross-sheet consistency
- Room identifiers line up among RCP, power, HVAC, sprinkler, ceilings
- Equipment elevations tagged on counted plans share tags with elevations
- RCP vs reflected floor clarified when both drive device placement
Specifications / divisions
- Referenced Divisions 01 / 22 / 23 / 26 / FA read when alternates hinge on them
- OFCI versus CFCI equipment paths identified
- Alternates enumerated only after bid-form rules are satisfied
Site / staging / tempo
- Access narratives align with sequencing drawings
- Temporary power narratives match manpower assumptions
- Existing-condition overlays reviewed when demos affect routing
Bid form housekeeping
- Alternates, unit prices, apprentice / PLA / tracking clauses captured verbatim
- Allowance wording matches allowances called out graphically
- Tax freight escalation flags align with estimating policy
Folder intelligence. Verbatim harvest, cross-sheet concerns, code-edition mismatch alerts, and conflict detection automate parts of this review — habits on paper still earn trust inside review meetings. Multi-discipline narrative report—download a single Markdown / DOCX / PDF report that stitches the verbatim plan harvest, every completed takeoff, conflict log, draft RFIs, and bid-bucket reconciliation against engineer-printed totals (when fixture or equipment schedules are present) into one decision-ready package per project.