We read the parcel documents.You decide.
Parcel, plat, and zoning sit in separate files.Reading them by hand takes the hours before design starts.We read what those records show.You decide go or no-go.
Request access now. Confirmation is immediate. An invite follows when a seat opens.
Why SiteM8 exists
The site starts as a parcel map, a plat, and a zoning file.
Reading those by hand takes the hours before design starts.
We read what those records show and cite the source.
You decide.
How SiteM8 works
Upload the parcel documents
Upload the parcel map, plat, zoning excerpt, and early site PDFs.SiteM8 treats each file as a source.Show what can be built
Coverage, setbacks, parking, and easements land in a site memo with a citation back to the source.You decide
Go, pass, or send to counsel.SiteM8 does not stamp entitlements or invent a variance outcome.The next survey stays on the same memo
Later surveys update the memo.No restart from a blank memo.
Inside the workspace
Every project shows where it stands and what you do next. This sample is not a live job.
Reads parcel and zoning · cites the envelope · you call go or no-go
Corner lot — envelope read
Parcel · plat · zoning
Open the site memo and confirm citations before schematic hours. You call go or no-go.
What SiteM8 does
Closed pilot is for architects and developers screening sites.Pulling the parcel straight from the county map stays later.It is not in this list.
- Upload parcel, plat, zoning, and early site PDFs once. SiteM8 treats each file as a source.
- Show what can be built — coverage, setbacks, parking, easements — with a citation back to the source.
- Flag variance and entitlement themes as questions, not as legal conclusions.
- Keep the go/no-go memo tied to the source documents, not a chat transcript.
- Show the principal what is known vs still a question before schematic hours.
- Export a site memo for the design principal or owner with the citation trail attached.
- You review, confirm, and call go or no-go.
What SiteM8 does not do
- SiteM8 is not a replacement for a land-use attorney or planner of record.
- SiteM8 does not auto-approve entitlements or variances.
- SiteM8 is not a takeoff or bid-estimate product — that is Estym8.
- SiteM8 is not municipal plan check — that is ColdEyes.
- SiteM8 is not the check an architect runs before issuing drawings — that is PlanM8.
- SiteM8 is not an ICT Basis of Design — that is Bodi.
- SiteM8 is the site read, not a chatbot.
How to get access
Request access
Use your work email.Get confirmation
It arrives as soon as you submit.Wait for an invite
An invite follows when a seat opens.
SiteM8 is the site read. It is not a chatbot and it does not own the go or no-go call.
One suite.Multiple products.
- We count the symbols.You price the bid.
- We tie each claim to its source.You decide.
- We draft the findings.Staff keep the stamp.
- We check the drawing set.You issue.
- We read the parcel documents.You decide.
Read the site before schematic
Request access, and an invite follows when a seat opens.